Concrete Driveways - Exposed Aggregate Finishes

3/8" colorful pebbles are placed in the concrete at the plant or "seeded" into the concrete at the jobsite. At the right time during the finishing operation, the top layer of cement paste is washed off the surface leaving the tops of the pebbles exposed.

Review the section about exposed aggregate.

Find a Concrete Driveways Contractor

Return to Concrete Driveways

Site Sponsors