Plumbing Code RequirementsConcrete Basement
Related Links: Pre-Finished Basement Wall Panels The Number # 1 Problem in Finishing Basements: Moisture Hiring a Basement Refinishing Contractor Permits For Various Basement Project Phases Repairing Bowed Basement Walls Considerations for Some Popular Uses Take Your Creativity Out Of Storage When Planning a New Basement Show location of any new plumbing fixture such as bar sink(s), bathroom sinks, toilets, bathtubs, showers, hot water heater(s), floor drain(s) and other plumbing fixtures on the floor plans. Show location of plumbing chases. Show the location of new washer hose connection bibs and laundry standpipe in new laundry rooms/space. All cleanouts, valves, shut-offs and mechanical joints shall be accessible. Minimum clearance in front of cleanouts shall be 18 inches on 3 inches and larger pipes, and 12 inches on smaller pipes. Concealed cleanouts shall be provided with access of sufficient size to permit removal of the cleanout plug and rodding of the system. Cleanout plugs shall not be concealed with any permanent finishing material. Fixtures having concealed tubular traps shall be provided with an access panel or unobstructed utility space 12 inches in the least dimension. Showers: Bathroom sinks: Toilets: Bathtubs: Sinks: Laundry tubs: Clothes washers: Find a Finished Basements Contractor Return to Finished Basements Find a Concrete Contractor 24 Services in 221 Metros -- U.S. and Canada © 1999-2009 ConcreteNetwork.com None of this site may be reproduced without written permission |
Find Finished Basement Contractors Design Ideas Section Sponsor |