Architects, Engineers, Property Owners, and Other Important People: Job Planning

Job planning requires the important people in a project main known any special requirements they have prior to the project being put out to bid.

  • Time schedules
  • How work will be done around existing operations
  • Allowing drying time if water is used in the surface preparation process
  • Acceptable levels of dust
  • Possible fumes
  • Noise levels

These are all problems that can be avoided if known about and planned for ahead.

Return to Surface Preparation

Site Sponsors