Overlayment ProceduresAdhesive Stencil ApplicationAfter surface preparation has been completed, entire base coat is applied and allowed to dry. Adhesive stencil is then applied. After stencil is applied to the entire slab, the topcoat is applied. Stencil is removed as soon as possible—don't leave in too long. Chips are blown off with a leaf blower and then seal to overlay manufacturer's specifications. Return to Stenciling Concrete Find a Concrete Contractor 24 Services in 221 Metros -- U.S. and Canada © 1999-2009 ConcreteNetwork.com None of this site may be reproduced without written permission |