Length - 03:02 The timeline for applying a basic decorative concrete floor can differ greatly from job to job. Harris classifies a basic application as one that's not overly intricate, with no sawcuts, no stencils, and with just one color covered by a sealer or wax finish. On a small project, such as a basement floor, the timeline can range anywhere from two days to five or six days. Considerations include:
Find a Concrete Contractor 24 Services in 221 Metros -- U.S. and Canada © 1999-2009 ConcreteNetwork.com None of this site may be reproduced without written permission |